# Harpers Ferry Scaffolding

Canonical: https://abierto.us/opportunities/1282a724q0047

- Solicitation number: 1282A724Q0047
- Notice type: Solicitation
- Status: Closed. Deadline was August 30, 2024 at 12:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Harpers Ferry Job Corps (1233GX)
- NAICS: 332510 Hardware Manufacturing
- Product or service code: 5440 Scaffolding Equipment and Concrete Forms
- Set-aside: Total small business set-aside
- Place of performance: Harpers Ferry, West Virginia
- County: Jefferson County (FIPS 54037). https://abierto.us/counties/jefferson-county-wv-54037
- City: Harpers Ferry. https://abierto.us/cities/harpers-ferry-wv-5435284
- First posted: August 23, 2024
- Last posted: August 23, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/e2c7dd1e88854581add8ced17ff83cff/view

## Description

Qty 1 - This 1/3 Scale Scaffold Kit is available as a 4-High kit.

**SFS-400 Kit Contains:** (4) Mud Sills (wood) (4) Leveling Jacks (8) Frames (8) Diagonal X-Braces (5) Planks (wood) (2) Guard Rail Ends (2) Mid-rails (2) Handrails All connectors & pins Qty 1 - This 1/3 Scale Scaffold Kit is available as a starter kit.

**TUBE & CLAMP STARTER KIT Contains:** (20) 24" Tubes (4) 32" Tubes (18) Swivel Clamps (22) Rigid Clamps (4) Base Plates (4) Mudsills (5) Planks (uncleated) (1) Ladder Section Nut Driver Qty 1 - This 1/3 Scale Scaffold Kit is available as a 2-High, the frames come with connector pins installed.

LSF-200 Kit contains: (4) Mud Sills (wood) (4) Leveling Jacks (4) Frames (4) Diagonal X Braces (5) Planks (wood) (2) Guard Rail Ends (2) Mid-rails (2) Handrails 4 All connectors & pins Qty 1 - System Scaffolding, Ring and pin for use in the classroom. Over all 40" tall 25" X 22" System Scaffolding 1/3 scale starter kit.

(4) 2 Ring tubes (Vertical) (4) 4 Ring tubes (Vertical) (10) 23" Horizontal Tubes (10) 22.25" Horizontal Tubes (4) Vertical Braces with clamp ends Clamp On Ladder (2 section) (5) Planks (4) Screw Jacks (4) Mud Sills Qty 1 This 1/6 Scale Scaffolding Training Kit, the frames (11"X11") come with connector pins and comes complete from base plates to handrails.

**1/6 Frame SFS-200 Kit Contains:** (Build 2 high or 2 bays wide) (6) Mud Sills (wood) (6) Leveling Jacks (4) Frames (4) Diagonal X-Braces (10) Planks (wood) (2) Guard Rail Ends (2) Center posts (4) Mid-rails (4) Handrails Toe Boards All Connectors & pins

## Publications

- August 23, 2024: Solicitation, due August 30, 2024 at 12:00 PM EDT. Notice 14ed044fcadb4676ae9f226a2195b617. https://sam.gov/workspace/contract/opp/14ed044fcadb4676ae9f226a2195b617/view
- August 23, 2024: Solicitation, due August 30, 2024 at 12:00 PM EDT. Notice e2c7dd1e88854581add8ced17ff83cff. https://sam.gov/workspace/contract/opp/e2c7dd1e88854581add8ced17ff83cff/view

## Points of contact

- Jeffrey Salyers, jeffrey.r.salyers@usda.gov, 423-426-0188

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/1282a724q0047.
