# TBRD Water Leak Repair

Canonical: https://abierto.us/opportunities/127eax26q0087

- Solicitation number: 127EAX26Q0087
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was September 7, 2026 at 2:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Usda-Fs, Csa Southwest 7 (127EAX)
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Product or service code: J045 Maintenance, Repair and Rebuilding of Equipment: Plumbing, Heating, and Waste Disposal Equipment
- Set-aside: Total small business set-aside
- Place of performance: Roosevelt, Arizona
- First posted: August 6, 2026
- Last posted: September 1, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/13bc134b1d974b519c8a53c29aeda7d7/view

## Description

Amendment 0001 - The purpose of this amendment is to attach the Questions and Answers and Site Visit Sign-In Sheet. This amendment also attaches an updated Schedule of Items, Attachment 5. Quote Due Date has not changed. The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks.

At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service. Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop.

After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape. The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future. The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project.

The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.

## Publications

- August 6, 2026: Combined synopsis and solicitation, due September 7, 2026 at 2:00 PM EDT. Notice 634dc17ceb484e81b84b6c48fdfd9189. https://sam.gov/workspace/contract/opp/634dc17ceb484e81b84b6c48fdfd9189/view
- August 6, 2026: Combined synopsis and solicitation, due September 7, 2026 at 2:00 PM EDT. Notice 650326921d2244b183b186dcb2f3b2a1. https://sam.gov/workspace/contract/opp/650326921d2244b183b186dcb2f3b2a1/view
- September 1, 2026: Combined synopsis and solicitation, due September 7, 2026 at 2:00 PM EDT. Notice 13bc134b1d974b519c8a53c29aeda7d7. https://sam.gov/workspace/contract/opp/13bc134b1d974b519c8a53c29aeda7d7/view