# Nez Perce-Clearwater NF Salmon River Seed Orchard Well Drilling

Canonical: https://abierto.us/opportunities/1240lu25q0037

- Solicitation number: 1240LU25Q0037
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was September 2, 2025 at 1:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Usda-Fs, Csa Intermountain 9 (1240LU)
- NAICS: 237110 Water and Sewer Line and Related Structures Construction
- Product or service code: J046 Maintenance, Repair and Rebuilding of Equipment: Water Purification and Sewage Treatment Equipment
- Set-aside: Total small business set-aside
- Place of performance: White Bird, Idaho
- County: Idaho County (FIPS 16049). https://abierto.us/counties/idaho-county-id-16049
- City: White Bird. https://abierto.us/cities/white-bird-id-1687310
- First posted: August 19, 2025
- Last posted: August 19, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/1824b1c1855e432db205d378d6b0cc8d/view

## Description

Nez Perce-Clearwater NF Salmon River Seed Orchard Well Drilling C.1 SCOPE OF CONTRACT This project aims to provide potable water to the nursery located at the Salmon River Seed Orchard. The Forest Service plans to drill a well to provide potable water to the nursery. The well will be completed in accordance with the plans and specifications provided by the Forest.

If the first well drilled does not meet specifications, then, additional alternative 1 (Option 1) will be utilized to decommission the first well drilled and then drill a second well. If well 2 does not meet specifications, then additional alternative 2 (Option 2) will be utilized to decommission the second well. C.2 PROJECT LOCATION This project is in the Salmon River Seed Orchard contained within the Nez Perce-Clearwater National Forests. The project is located in Section 23, Township 26N, Range 1E.

C.3 MAGNITUDE OF CONSTRUCTION PROJECT In accordance with FAR Part 36.204(c) Between $100,000 and $250,000. C.4 SITE VISIT Per FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Contractors are highly encouraged to visit the Salmon River Seed Orchard to familiarize themselves with the layout of the site.

C.5 PERIOD OF PERFORMANCE Work on the site shall commence no earlier than October 15, 2025, and proceed in accordance with the contractor’s approved work schedule and run continuously till the end of the project no later than October 15th, 2026.

## Publications

- August 19, 2025: Combined synopsis and solicitation, due September 2, 2025 at 1:00 PM EDT. Notice 1824b1c1855e432db205d378d6b0cc8d. https://sam.gov/workspace/contract/opp/1824b1c1855e432db205d378d6b0cc8d/view

## Points of contact

- Daniel Franco, daniel.franco@usda.gov, 520/388-8328

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/1240lu25q0037.