# BITTERROOT NATIONAL FOREST - Little Rock Creek Trail Bridge Replacement

Canonical: https://abierto.us/opportunities/1240lu24q0059

- Solicitation number: 1240LU24Q0059
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Oregon Woods, Inc. for $259,670.00
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Bitterroot National Forest (120351)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Set-aside: Total small business set-aside
- Place of performance: Montana
- County: Ravalli County (FIPS 30081). https://abierto.us/counties/ravalli-county-mt-30081
- City: Darby. https://abierto.us/cities/darby-mt-3019300
- First posted: July 2, 2024
- Last posted: September 24, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/6bf1b2f68a29459184aa53f0ad59cdd6/view

## Description

**PROJECT DESCRIPTION:** The project is for the removal of an existing 35-ft single log foot bridge over Little Rock Creek on Forest Service Trail #580 at milepost 2.87, and installing a new 41-ft glulam stringer pack/pedestrian trail bridge with rock-filled gabion basket foundation. This project includes:

1) Dispose of an existing approximate 35-ft long single log foot bridge, 2) Construction of a new 41-ft, glulam stringer bridge, including associated trail approach work, footings, and drainage improvements.

**PROJECT LOCATION:** This project is located at milepost 2.87 over Little Rock Creek on Forest Trail # 580 on the Darby Ranger District, USFS, in Ravalli County, MT, Section 35, Township 4 North, Range 22 West. The project is approximately 3 miles west of the Lake Como Recreation Area, which is located approximately 8 miles northwest of Darby, MT. This project is located three miles from the closest road. Helicopter flights and mechanized/motorized use is allowed at the site. There is no vehicular access to the bridge site.

**PERIOD OF PERFORMANCE:** It is anticipated that work can begin September 15, 2025 with work being completed by November 14, 2025. Contract period of performance is 60 days. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $100,000 and $250,000. AMENDMENT 001 - Updated Attachment J-2 Standard Glulam Stringer Trail Bridge Drawings Question and Answers as of 8/23/2024 Updated Questions and Answers as of 8/27/2024

## Award on USAspending

- Recipient: Oregon Woods, Inc. (UEI DWBRENSC9MM3)
- Contract: 1240LU24C0053, definitive contract
- Obligated: $259,670.00
- Competition: Competed Under SAP, 4 offers received
- Link: award number 1240LU24C0053 equals the contract number; same sub-agency 12C2 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_1240LU24C0053_12C2_-NONE-_-NONE-/


## Publications

- July 2, 2024: Presolicitation. Notice 9e280bebf3cc4c4091121cece3b00247. https://sam.gov/workspace/contract/opp/9e280bebf3cc4c4091121cece3b00247/view
- August 2, 2024: Solicitation, due August 26, 2024 at 6:00 PM EDT. Notice 659932bb4f9e4a67a39cb87f71a27148. https://sam.gov/workspace/contract/opp/659932bb4f9e4a67a39cb87f71a27148/view
- August 23, 2024: Solicitation, due September 3, 2024 at 6:00 PM EDT. Notice 030ead39089740a797ffc3ba414b7890. https://sam.gov/workspace/contract/opp/030ead39089740a797ffc3ba414b7890/view
- August 27, 2024: Solicitation, due September 3, 2024 at 6:00 PM EDT. Notice 164bae2796f64aefa6e4409aad6f3e2b. https://sam.gov/workspace/contract/opp/164bae2796f64aefa6e4409aad6f3e2b/view
- September 24, 2024: Award notice. Notice 6bf1b2f68a29459184aa53f0ad59cdd6. https://sam.gov/workspace/contract/opp/6bf1b2f68a29459184aa53f0ad59cdd6/view

## Points of contact

- Alisha Knaub, alisha.knaub@usda.gov, 406-438-2981

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/1240lu24q0059.
