# HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Canonical: https://abierto.us/opportunities/1240lt27q0026

- Solicitation number: 1240LT27Q0026
- Notice type: Combined synopsis and solicitation
- Status: Open. Offers due November 28, 2026 at 7:00 PM EST
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: White River National Forest (1282D7)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Place of performance: Bridgeport, California
- County: Mono County (FIPS 06051). https://abierto.us/counties/mono-county-ca-06051
- City: Bridgeport. https://abierto.us/cities/bridgeport-ca-0608240
- First posted: October 29, 2026
- Last posted: October 29, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/f4fababddec242cf9e116ccfb1aba466/view

## Description

HUMBOLDT TRAIL BRIDGE REPLACEMENT

Pacific Coast (PCT)

Forest: Humboldt-Toiyabe National Forest (HTNF)

Bridgeport Ranger Station

The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.

Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.

ATTACHMENTS:

C04a ScheduleOfItems_SectionB_1240LT27Q0026

C04b DesignDrawings_1240LT27Q0026

C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026

C04d Experience Questionnaire_1240LT27Q0026

C04e Past Performance Data Sheet_1240LT27Q0026

 AWARD SCHEDULE:

Site Visit: 11/03/2026 - to be held on Zoom do to location

Q&A Due Date: 11/04/2026

Quotes Due Date: 11/28/2026 - 1700 MT

Anticipated Award Date: 12/10/2026

POP: July/01/2027 - 10/29/2027 = 120 days

Contracting Officer Representative:

Jordan Burge

Civil Engineer - FS-IRR4-HNF-RELMHS

jordan.burge@usda.gov

## Attachments

- [C04e - Past Performance Data Sheet_1240LT27Q0026.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d2123139e3814a92a7c3f3e710123e4b/download)

## Open now in the same industry

35 open in NAICS 237310.

- FY27 NRM - Correct Mather Loop Road and Install Speed Bumps (36C26127Q0112), due November 2, 2026 at 3:00 PM EST. https://abierto.us/opportunities/36c26127q0112
- BRCA 310427 Southbound Shuttle Stop (140P2026R0065), due November 3, 2026 at 1:00 PM EST. https://abierto.us/opportunities/140p2026r0065
- TX FW LGA 10(5) Steve Thompson Wildlife Drive (6982AF27B000006), due November 3, 2026 at 4:00 PM EST. https://abierto.us/opportunities/6982af27b000006

## Publications

- October 29, 2026: Combined synopsis and solicitation, due November 28, 2026 at 7:00 PM EST. Notice f4fababddec242cf9e116ccfb1aba466. https://sam.gov/workspace/contract/opp/f4fababddec242cf9e116ccfb1aba466/view

## Points of contact

- Lonnie D Root, Contracting Officer, lonnie.root@usda.gov, Emails Only
- Jordan Burge, jordan.burge@usda.gov, 775-352-1243

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/1240lt27q0026.