{"canonical":"https://abierto.us/opportunities/1240lt26q0120","key":"1240LT26Q0120","url":"https://abierto.us/opportunities/1240lt26q0120","title":"Silver Lake Restroom Roof Replacement","solicitation_number":"1240LT26Q0120","notice_type":"k","open":false,"response_deadline":"2026-08-10T23:00:00Z","first_posted":"2026-07-02","last_posted":"2026-07-15","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"Unita-Wasatch-Cache National Forest","naics":"238160","psc":"5650","set_aside":"SBA","place_state":"UT","winner":null,"award_amount":null,"publications":[{"notice_id":"5ebc134539814ba68ecc5e31429e8221","title":"Silver Lake Restroom Roof Replacement","solicitation_number":"1240LT26Q0120","notice_type":"k","base_type":"k","posted":"2026-07-02","posted_at":null,"due_at":"2026-07-29T23:00:00Z","due_date":"2026-07-29","cancelled":null,"archived":null,"archive_date":"2026-08-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5ebc134539814ba68ecc5e31429e8221/view","enriched":false,"history":[]},{"notice_id":"63eb6919943a468f9102c8393ea924ed","title":"Silver Lake Restroom Roof Replacement","solicitation_number":"1240LT26Q0120","notice_type":"k","base_type":"k","posted":"2026-07-15","posted_at":null,"due_at":"2026-08-10T23:00:00Z","due_date":"2026-08-10","cancelled":null,"archived":null,"archive_date":"2026-08-25","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/63eb6919943a468f9102c8393ea924ed/view","enriched":false,"history":[]}],"latest_notice_id":"63eb6919943a468f9102c8393ea924ed","first_type":"k","notices":[{"dates":{"posted":"2026-07-02","response_deadline":{"raw":"2026-07-29T17:00:00-06:00","utc":"2026-07-29T23:00:00Z","date":"2026-07-29","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5ebc134539814ba68ecc5e31429e8221/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Silver Lake Restroom Roof Replacement","agency":{"office":{"code":"1284A0","name":"Unita-Wasatch-Cache National Forest"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"84095","city":"SOUTH JORDAN","state":"UT","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-08-13","archive_type":"auto15"},"contacts":[{"name":"Derrick A Dodson","role":"primary","email":"derrick.dodson@usda.gov"},{"name":"Jason Day","role":"secondary","email":"jason.day@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"5ebc134539814ba68ecc5e31429e8221","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"ad06a2012ceb1ad5fecdc1f63ec0936218c72d12f2ce98c6dec4fca1500fd696","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T00:55:27.040971Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"text":"This project consists of removing and replacing the Silver Lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240LT26Q0120","place_of_performance":{"city":{"name":"Salt Lake City"},"state":{"code":"UT"},"country":{"code":"USA"}},"product_service_code":"5650"},{"dates":{"posted":"2026-07-15","response_deadline":{"raw":"2026-08-10T17:00:00-06:00","utc":"2026-08-10T23:00:00Z","date":"2026-08-10","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/63eb6919943a468f9102c8393ea924ed/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Silver Lake Restroom Roof Replacement","agency":{"office":{"code":"1284A0","name":"Unita-Wasatch-Cache National Forest"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"84095","city":"SOUTH JORDAN","state":"UT","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-08-25","archive_type":"auto15"},"contacts":[{"name":"Derrick A Dodson","role":"primary","email":"derrick.dodson@usda.gov"},{"name":"Jason Day","role":"secondary","email":"jason.day@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"63eb6919943a468f9102c8393ea924ed","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"ec9e16371474c962308f8bdcff5d78fcba41548084f8be3bbc4a0367aede0e32","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T00:55:27.040971Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"text":"This project consists of removing and replacing the Silver Lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240LT26Q0120","place_of_performance":{"city":{"name":"Salt Lake City"},"state":{"code":"UT"},"country":{"code":"USA"}},"product_service_code":"5650"}],"due_at":"2026-08-10T23:00:00Z","due_date":"2026-08-10","closes_at":"2026-08-10T23:00:00Z","awardable":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1284A0","office_name":"Unita-Wasatch-Cache National Forest","state":"UT","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z","principal_notice_id":"63eb6919943a468f9102c8393ea924ed","description":{"text":"This project consists of removing and replacing the Silver Lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.","html":null,"origin":"extract"},"contacts":[{"name":"Derrick A Dodson","role":"primary","email":"derrick.dodson@usda.gov"},{"name":"Jason Day","role":"secondary","email":"jason.day@usda.gov"}],"place_of_performance":{"city":{"name":"Salt Lake City"},"state":{"code":"UT"},"country":{"code":"USA"}},"office_address":{"zip":"84095","city":"SOUTH JORDAN","state":"UT","country":"USA"},"naics_codes":["238160"],"award":null,"attachments":[],"awards":[],"related":[]}