# GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

Canonical: https://abierto.us/opportunities/1240lt26q0106

- Solicitation number: 1240LT26Q0106
- Notice type: Combined synopsis and solicitation
- Status: Open. Offers due September 23, 2026 at 5:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: USDA Forest Service (123187)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Z2LB Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
- Set-aside: Total small business set-aside
- Place of performance: Beaver, Utah
- First posted: August 12, 2026
- Last posted: September 3, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/ce4b67c126ce4561b69eb85313a19f51/view

## Description

On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106.

2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026 3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026 This amendment must be acknowledged and submitted with your proposal.

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106. This SF30 must be acknowledged and submitted with your proposal.

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements.

The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

## Publications

- August 12, 2026: Combined synopsis and solicitation, due September 23, 2026 at 5:00 PM EDT. Notice e5110652dba34728aa0888c5a49a3ba4. https://sam.gov/workspace/contract/opp/e5110652dba34728aa0888c5a49a3ba4/view
- August 19, 2026: Combined synopsis and solicitation, due September 23, 2026 at 5:00 PM EDT. Notice 559dca0e0deb47d5bbfb7cf8c9b8ee2b. https://sam.gov/workspace/contract/opp/559dca0e0deb47d5bbfb7cf8c9b8ee2b/view
- September 3, 2026: Combined synopsis and solicitation, due September 23, 2026 at 5:00 PM EDT. Notice ce4b67c126ce4561b69eb85313a19f51. https://sam.gov/workspace/contract/opp/ce4b67c126ce4561b69eb85313a19f51/view

## Points of contact

- James Edington, james.edington@usda.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/1240lt26q0106.
