# Remove & Replace Interior & Exterior Greenhouse Siding

Canonical: https://abierto.us/opportunities/12405b24r0026

- Solicitation number: 12405B24R0026
- Notice type: Award notice (first published as combined synopsis and solicitation)
- Status: Awarded to Construct-All U.S.A Inc. for $89,210.00
- Department: Department of Agriculture
- Agency: Agricultural Research Service
- Contracting office: USDA ARS Sea Aao Acq/Per Prop (12405B)
- NAICS: 238170 Siding Contractors
- Product or service code: Z2PZ Repair Or Alteration Of Other Non-Building Facilities
- Set-aside: Total small business set-aside
- Place of performance: Tifton, Georgia
- County: Tift County (FIPS 13277). https://abierto.us/counties/tift-county-ga-13277
- City: Tifton. https://abierto.us/cities/tifton-ga-1376476
- First posted: July 19, 2024
- Last posted: September 18, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/25323283ca4a408ea462fd726275d2f4/view

## Description

Questions and Answers Q1. In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles? A1. Yes Q2. Are contractors required to issue a contract specific QA/QC Plan? A2. Not required, but can be useful. Q3. Are contractors required to issue a contract specific Safety Plan? A3. You should have this. Q4. Is this project tax exempt? A4. We are the US government so that it is tax exempt. Q5. Is there any asbestos on the structure of the greenhouses? A5. There is no asbestos.

It was tested last year Q6.Is asbestos abatement required? A6. No asbestos abatement required Q7. Will all framing remain and only change from glass to polycarbonate? A7. All framing will remain in place. Yes just changing from glass to poly Q8.Current glass framing is on nominally 2ft centers. Are we to keep existing framing and cut polycarbonate to fit existing frame? A8. Yes existing framing will stay in place, poly must be cut to existing frame.

If contractors organization requires the contractor to install extra supports ect. please add into quote for submittal. Q9. Should the contractor remove framing to install 4ft wide polycarbonate panels? A9. No framework should need to be removed to use 4ft sheets. Q10. Confirm that no work to the doors of the greenhouse bays or the corridor doors is to be done? A10. No work is to be done to doors. They are staying as is. Q11.

Are any mechanical or electrical systems to be modified other than what is necessary to remove and replace wall coverings? A11. No systems removed or modified apart from whats necessary to install roof extrusions or wall coverings Q12. Will the government remove all items from greenhouses before construction? A12. Government technicians assigned to each bay will be responsible for moving their studies/ equipment from construction area.

**A. Project Title:** Remove and Replace Interior and Exterior Greenhouse Siding. B. Competition is set aside for Small Businesses. Applicable NAISC is 238170 Siding Contractors. C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $25,000 and $100,000. D. Prospective offerors shall complete block 14, 15, and 19. E. Prospective offerors shall be registerred with System for Award Management (SAM) with an active registration.

## Award on USAspending

- Recipient: Construct-All U.S.A Inc. (UEI GPYFCLJRSXM8)
- Contract: 12405B24C0026, definitive contract
- Obligated: $89,209.98
- Competition: Competed Under SAP, 4 offers received
- Link: award number 12405B24C0026 equals the contract number; same awarding office 12405B (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_12405B24C0026_12H2_-NONE-_-NONE-/


## Publications

- July 19, 2024: Combined synopsis and solicitation, due August 23, 2024 at 5:00 PM EDT. Notice ae91d7540dd743b795d29f8d182c4554. https://sam.gov/workspace/contract/opp/ae91d7540dd743b795d29f8d182c4554/view
- July 22, 2024: Combined synopsis and solicitation, due August 23, 2024 at 5:00 PM EDT. Notice 316045a4149d42aa984775dac63e2184. https://sam.gov/workspace/contract/opp/316045a4149d42aa984775dac63e2184/view
- August 22, 2024: Combined synopsis and solicitation, due August 23, 2024 at 5:00 PM EDT. Notice b6e3885124a04193a9b0323c2cefe98f. https://sam.gov/workspace/contract/opp/b6e3885124a04193a9b0323c2cefe98f/view
- September 18, 2024: Award notice. Notice 25323283ca4a408ea462fd726275d2f4. https://sam.gov/workspace/contract/opp/25323283ca4a408ea462fd726275d2f4/view

## Points of contact

- Lynn Hults, lynn.hults@usda.gov, 9124649723

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/12405b24r0026.