{"canonical":"https://abierto.us/opportunities/12363n25r4004","key":"12363N25R4004","url":"https://abierto.us/opportunities/12363n25r4004","title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","solicitation_number":"12363N25R4004","notice_type":"a","open":false,"response_deadline":"2025-07-07T19:00:00Z","first_posted":"2025-04-16","last_posted":"2025-08-07","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"115310","psc":"F099","set_aside":null,"place_state":"OR","place_county":"41017","place_county_name":"Deschutes County","place_city":"4105800","place_city_name":"Bend","winner":"BOULDER RIDGE, LLC","award_amount":"3933539.00","publications":[{"notice_id":"33bb310ae997402bb2cccf185939900c","title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","solicitation_number":"12363N25R4004","notice_type":"p","base_type":"p","posted":"2025-04-16","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-06-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/33bb310ae997402bb2cccf185939900c/view","enriched":false,"history":[]},{"notice_id":"3df0ea8941264c928095a15fdc0d4823","title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","solicitation_number":"12363N25R4004","notice_type":"p","base_type":"p","posted":"2025-05-02","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-06-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3df0ea8941264c928095a15fdc0d4823/view","enriched":false,"history":[]},{"notice_id":"fbcc8df9fc924fbfbf81d921200afef0","title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","solicitation_number":"12363N25R4004","notice_type":"o","base_type":"p","posted":"2025-05-13","posted_at":null,"due_at":"2025-07-07T19:00:00Z","due_date":"2025-07-07","cancelled":null,"archived":null,"archive_date":"2025-08-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fbcc8df9fc924fbfbf81d921200afef0/view","enriched":false,"history":[]},{"notice_id":"ee5aac075dd648ff82d92aa1d9e94fb5","title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","solicitation_number":"12363N25R4004","notice_type":"o","base_type":"o","posted":"2025-06-04","posted_at":null,"due_at":"2025-07-07T19:00:00Z","due_date":"2025-07-07","cancelled":null,"archived":null,"archive_date":"2025-08-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ee5aac075dd648ff82d92aa1d9e94fb5/view","enriched":false,"history":[]},{"notice_id":"c50cc557c27843f8afb148dadd3b5a82","title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","solicitation_number":"12363N25C4004","notice_type":"a","base_type":"o","posted":"2025-08-07","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-08-22","award_number":"12363N25C4004","awardee_name":"BOULDER RIDGE, LLC Bend","amount":"3933539.00","link_sam":"https://sam.gov/workspace/contract/opp/c50cc557c27843f8afb148dadd3b5a82/view","enriched":false,"history":[]}],"latest_notice_id":"c50cc557c27843f8afb148dadd3b5a82","first_type":"p","notices":[{"dates":{"posted":"2025-04-16"},"links":{"sam":"https://sam.gov/workspace/contract/opp/33bb310ae997402bb2cccf185939900c/view"},"naics":{"codes":["115310"],"primary":"115310"},"title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-30","archive_type":"auto_custom"},"contacts":[{"name":"Ingrid Anderson","role":"primary","email":"ingrid.anderson@usda.gov","phone":"541-527-5462"},{"name":"Lindsey Dalton","role":"secondary","email":"lindsey.dalton@usda.gov","phone":"541-316-9011"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"33bb310ae997402bb2cccf185939900c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"0ed5fa224dac67710c68f7f3c9a65ee51915f751072859c5c6979bedeb349ef7","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"DESCRIPTION Background: The Hut DxP NPL Stewardship IRSC shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014—Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. NAICS: 115310: Support Services for Forestry, size standard: $34M Fuels Management Services. Stewardship authorities permit the Government to solicit this requirement as Full and Open competition. Project Location: Approximately 10 miles southeast of Bend, OR. Within T18S R12E, Sections 33-34; T19S R12E, Sections 1-4, 9-16, 21-27; T19S R13E, Sections 6, 7, 8, 18-20, 30-31, Surveyed Willamette Meridian. SITE VISIT: A pre-bid trip is scheduled for May 6th, at 10:00 am (PST) at the junction of China Hat Road (Forest Road 18) and Forest Road 1810. Period of Perfomance: All work shall be completed by November 30th, 2032. Description of Work: The objectives of this project are to restore forested areas towards historic conditions, improve native vegetation resilience to disturbances, reduce the threat of large-scale wildfire to adjacent private landowners, and move towards a minimum road system by accomplishing the following: Cut and remove included saw timber and green convertible biomass (Grn Bio Cv) from the Contract Area, Road Reconstruction, Treatment of Stands (trees and/or brush), Cut/Skid/Deck, Subsoiling, Road Closures, Road Decommissioning (user created and forest system roads), Removal of Abandoned Vehicles. Estimated Included Timber Volume is as follows: Ponderosa Pine Sawtimber 19,474 CCF Lodgepole Pine Sawtimber 2,693 CCF Green Biomass Cv 3,330 CCF","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"12363N25R4004","place_of_performance":{"zip":"97701","city":{"name":"Bend"},"state":{"code":"OR"},"country":{"code":"USA"}},"product_service_code":"F099"},{"dates":{"posted":"2025-05-02"},"links":{"sam":"https://sam.gov/workspace/contract/opp/3df0ea8941264c928095a15fdc0d4823/view"},"naics":{"codes":["115310"],"primary":"115310"},"title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-30","archive_type":"auto_custom"},"contacts":[{"name":"Ingrid Anderson","role":"primary","email":"ingrid.anderson@usda.gov","phone":"541-527-5462"},{"name":"Lindsey Dalton","role":"secondary","email":"lindsey.dalton@usda.gov","phone":"541-316-9011"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"3df0ea8941264c928095a15fdc0d4823","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"886253e8db324025cf28d2c0013aceb1de7c70ac56812e12c4c2606f500fd261","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"UPDATE: 5.2.2025: The pre-bid trip/site visit that was scheduled for May 6th is postponed until further notice. A revised date will be scheduled when the solicitation contract package is issued here on SAM.gov. DESCRIPTION Background: The Hut DxP NPL Stewardship IRSC shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014—Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. NAICS: 115310: Support Services for Forestry, size standard: $34M Fuels Management Services. Stewardship authorities permit the Government to solicit this requirement as Full and Open competition. Project Location: Approximately 10 miles southeast of Bend, OR. Within T18S R12E, Sections 33-34; T19S R12E, Sections 1-4, 9-16, 21-27; T19S R13E, Sections 6, 7, 8, 18-20, 30-31, Surveyed Willamette Meridian. SITE VISIT: A pre-bid trip is scheduled for May 6th, at 10:00 am (PST) at the junction of China Hat Road (Forest Road 18) and Forest Road 1810. (Postponed as of 5.2.2025) Period of Perfomance: All work shall be completed by November 30th, 2032. Description of Work: The objectives of this project are to restore forested areas towards historic conditions, improve native vegetation resilience to disturbances, reduce the threat of large-scale wildfire to adjacent private landowners, and move towards a minimum road system by accomplishing the following: Cut and remove included saw timber and green convertible biomass (Grn Bio Cv) from the Contract Area, Road Reconstruction, Treatment of Stands (trees and/or brush), Cut/Skid/Deck, Subsoiling, Road Closures, Road Decommissioning (user created and forest system roads), Removal of Abandoned Vehicles. Estimated Included Timber Volume is as follows: Ponderosa Pine Sawtimber 19,474 CCF Lodgepole Pine Sawtimber 2,693 CCF Green Biomass Cv 3,330 CCF","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"12363N25R4004","place_of_performance":{"zip":"97701","city":{"name":"Bend"},"state":{"code":"OR"},"country":{"code":"USA"}},"product_service_code":"F099"},{"dates":{"posted":"2025-05-13","response_deadline":{"raw":"2025-07-07T12:00:00-07:00","utc":"2025-07-07T19:00:00Z","date":"2025-07-07","time":"12:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fbcc8df9fc924fbfbf81d921200afef0/view"},"naics":{"codes":["115310"],"primary":"115310"},"title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-30","archive_type":"auto_custom"},"contacts":[{"name":"Ingrid Anderson","role":"primary","email":"ingrid.anderson@usda.gov","phone":"541-527-5462"},{"name":"Lindsey Dalton","role":"secondary","email":"lindsey.dalton@usda.gov","phone":"541-316-9011"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"fbcc8df9fc924fbfbf81d921200afef0","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"14868fd1abcdb588a52f91cd6248d8a11b61d27b5ca2b1e9c5d3a34ab23b2d89","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Background: The Hut DxP NPL Stewardship IRSC shall be awarded using Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014—Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition. Project Location:The Hut DxP NPL Stewardship IRSC is located on the Deschutes National Forest, approximately 10 miles southeast of Bend, OR. Within T18S R12E, Sections 33-34; T19S R12E, Sections 1-4, 9-16, 21-27; T19S R13E, Sections 6, 7, 8, 18-20, 30-31, Surveyed Willamette Meridian. Site Visit Date and Time: A site visit is scheduled for Wednesday, May 21st, 2025 at 9:00 a.m. PDT at the Deschutes National Forest Supervisor’s Office at 63095 Deschutes Market Road, Bend, OR 97701. Plan to meet inside to discuss end-results and contractual requirements and then head to the field to view the contract area. Contractors shall email Ingrid Anderson at ingrid.anderson@usda.gov by 2:00 pm on Tuesday, May 20th, if they are planning to attend the meeting. Contractors that wish to view the site independently will need an approved waiver as this area is under a formal closure. Email contact Shannon Berg at shannon.berg@usda.gov or call at 541-383-4745 at least two business days prior to visiting to complete the required paperwork and receive approval to access. Description of Work: The objectives of this project are to restore forested areas towards historic conditions, improve native vegetation resilience to disturbances, reduce the threat of large-scale wildfire to adjacent private landowners, and move towards a minimum road system by accomplishing the following: Cut and remove included saw timber and green convertible biomass (Grn Bio Cv) from the Contract Area, Road Reconstruction, Treatment of Stands (trees and/or brush), Cut/Skid/Deck, Subsoiling, Road Closures, Road Decommissioning (user created and forest system roads), Removal of Abandoned Vehicles. Estimated Timber Volume is as follows: Ponderosa Pine Sawtimber 19,474 CCF Lodgepole Pine Sawtimber 2,693 CCF Green Biomass Cv 3,330 CCF The contract shall be awarded using a best value source selection method. Technical Proposals are required; see Sections L and M of the solicitation for instructions and evaluation details. The resulting contract shall be a firm, fixed price contract. Service Contract Act and Construction (Davis Bacon) Wage Determinations apply and have been provided as attachments to the solicitation. Period of Performance: The effective period of this contract is from date of award through 11/30/2032. Staggered deadlines apply to the Mandatory and Optional work. Due to the high priority of completing the project, a benchmark system will be utilized to ensure the swift implementation of mandatory items. Item 1, Cut and Removal of Included Material, shall be completed by November 30, 2030. Items 2A – 2L, Road Reconstruction, shall be completed by November 30, 2026 and shall be completed prior to hauling (associated with Item 1). Items 3 – 7 shall be completed by November 30, 2028. These benchmarks are the minimum requirements to meet, and Contractor is encouraged to complete as many acres as possible in any given year. See Evaluation Criteria for additional information. Construction Bonding: A bid bond or other acceptable bid guarantee valued at 20% of the construction total price offered (Mandatory Items 2A- 2L) shall be required and submitted with the initial offer. Bonding shall be required in connection to the value of the awarded construction work only. Payment and Performance bonds valued at 100% of the total construction price shall be required from the contract awardee.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"12363N25R4004","place_of_performance":{"zip":"97701","city":{"name":"Bend"},"state":{"code":"OR"},"country":{"code":"USA"}},"product_service_code":"F099"},{"dates":{"posted":"2025-06-04","response_deadline":{"raw":"2025-07-07T12:00:00-07:00","utc":"2025-07-07T19:00:00Z","date":"2025-07-07","time":"12:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ee5aac075dd648ff82d92aa1d9e94fb5/view"},"naics":{"codes":["115310"],"primary":"115310"},"title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-30","archive_type":"auto_custom"},"contacts":[{"name":"Ingrid Anderson","role":"primary","email":"ingrid.anderson@usda.gov","phone":"541-527-5462"},{"name":"Lindsey Dalton","role":"secondary","email":"lindsey.dalton@usda.gov","phone":"541-316-9011"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ee5aac075dd648ff82d92aa1d9e94fb5","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"78d3bbb1dd378a5ce51ce3d4ee8795497cf0b0c1456af4d3061dd832a337cc51","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"A001 (6.4.2025): This Amendment makes minor edits to the Solicitation and Appendix D (revised docs attached) and attaches the Site Visit Notes and attendee list from the site visit held on May 21,2025. Fill out and return the SF-30 with your proposal package only if submitting an offer. Background: The Hut DxP NPL Stewardship IRSC shall be awarded using Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014—Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition. Project Location:The Hut DxP NPL Stewardship IRSC is located on the Deschutes National Forest, approximately 10 miles southeast of Bend, OR. Within T18S R12E, Sections 33-34; T19S R12E, Sections 1-4, 9-16, 21-27; T19S R13E, Sections 6, 7, 8, 18-20, 30-31, Surveyed Willamette Meridian. Site Visit Date and Time: A site visit is scheduled for Wednesday, May 21st, 2025 at 9:00 a.m. PDT at the Deschutes National Forest Supervisor’s Office at 63095 Deschutes Market Road, Bend, OR 97701. Plan to meet inside to discuss end-results and contractual requirements and then head to the field to view the contract area. Contractors shall email Ingrid Anderson at ingrid.anderson@usda.gov by 2:00 pm on Tuesday, May 20th, if they are planning to attend the meeting. Contractors that wish to view the site independently will need an approved waiver as this area is under a formal closure. Email contact Shannon Berg at shannon.berg@usda.gov or call at 541-383-4745 at least two business days prior to visiting to complete the required paperwork and receive approval to access. Description of Work: The objectives of this project are to restore forested areas towards historic conditions, improve native vegetation resilience to disturbances, reduce the threat of large-scale wildfire to adjacent private landowners, and move towards a minimum road system by accomplishing the following: Cut and remove included saw timber and green convertible biomass (Grn Bio Cv) from the Contract Area, Road Reconstruction, Treatment of Stands (trees and/or brush), Cut/Skid/Deck, Subsoiling, Road Closures, Road Decommissioning (user created and forest system roads), Removal of Abandoned Vehicles. Estimated Timber Volume is as follows: Ponderosa Pine Sawtimber 19,474 CCF Lodgepole Pine Sawtimber 2,693 CCF Green Biomass Cv 3,330 CCF The contract shall be awarded using a best value source selection method. Technical Proposals are required; see Sections L and M of the solicitation for instructions and evaluation details. The resulting contract shall be a firm, fixed price contract. Service Contract Act and Construction (Davis Bacon) Wage Determinations apply and have been provided as attachments to the solicitation. Period of Performance: The effective period of this contract is from date of award through 11/30/2032. Staggered deadlines apply to the Mandatory and Optional work. Due to the high priority of completing the project, a benchmark system will be utilized to ensure the swift implementation of mandatory items. Item 1, Cut and Removal of Included Material, shall be completed by November 30, 2030. Items 2A – 2L, Road Reconstruction, shall be completed by November 30, 2026 and shall be completed prior to hauling (associated with Item 1). Items 3 – 7 shall be completed by November 30, 2028. These benchmarks are the minimum requirements to meet, and Contractor is encouraged to complete as many acres as possible in any given year. See Evaluation Criteria for additional information. Construction Bonding: A bid bond or other acceptable bid guarantee valued at 20% of the construction total price offered (Mandatory Items 2A- 2L) shall be required and submitted with the initial offer. Bonding shall be required in connection to the value of the awarded construction work only. Payment and Performance bonds valued at 100% of the total construction price shall be required from the contract awardee.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"12363N25R4004","place_of_performance":{"zip":"97701","city":{"name":"Bend"},"state":{"code":"OR"},"country":{"code":"USA"}},"product_service_code":"F099"},{"award":{"date":"2025-08-07","amount":"3933539.00","number":"12363N25C4004","awardee":{"raw":"BOULDER RIDGE, LLC Bend OR 97702 USA","name":"BOULDER RIDGE, LLC Bend","location":{"zip":"97702","state":{"code":"OR"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-08-07","award_date":"2025-08-07"},"links":{"sam":"https://sam.gov/workspace/contract/opp/c50cc557c27843f8afb148dadd3b5a82/view"},"naics":{"codes":["115310"],"primary":"115310"},"title":"Hut DxP NPL Stewardship IRSC -R6 Deschutes National Forest, Bend/Fort Rock Ranger District, OREGON","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-22","archive_type":"auto15"},"contacts":[{"name":"Ingrid Anderson","role":"primary","email":"ingrid.anderson@usda.gov","phone":"541-527-5462"},{"name":"Lindsey Dalton","role":"secondary","email":"lindsey.dalton@usda.gov","phone":"541-316-9011"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c50cc557c27843f8afb148dadd3b5a82","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"07f962976a5e5b79167ccddb9248378cb9fda60afde12382d4de1066650557a1","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Stewardship Integrated Resouce Service Contract was awarded. Total Service Value Awarded: $3,933,539.00 Total Product Value Awarded: $1,061,303.25 75% ($795,977.44) of the Product Value shall be traded for Service Work.","origin":"extract"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"12363N25C4004","place_of_performance":{"zip":"97701","city":{"name":"Bend"},"state":{"code":"OR"},"country":{"code":"USA"}},"product_service_code":"F099"}],"due_at":"2025-07-07T19:00:00Z","due_date":"2025-07-07","closes_at":"2025-07-07T19:00:00Z","awardable":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","state":"OR","county":"41017","county_name":"Deschutes County","city":"4105800","city_name":"Bend","country":"USA","winner_key":"N8Y8DDDK4EV5","amount":"3933539.00","linked_awards":5,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"c50cc557c27843f8afb148dadd3b5a82","description":{"text":"Stewardship Integrated Resouce Service Contract was awarded. Total Service Value Awarded: $3,933,539.00 Total Product Value Awarded: $1,061,303.25 75% ($795,977.44) of the Product Value shall be traded for Service Work.","html":null,"origin":"extract"},"contacts":[{"name":"Ingrid Anderson","role":"primary","email":"ingrid.anderson@usda.gov","phone":"541-527-5462"},{"name":"Lindsey Dalton","role":"secondary","email":"lindsey.dalton@usda.gov","phone":"541-316-9011"}],"place_of_performance":{"zip":"97701","city":{"name":"Bend"},"state":{"code":"OR"},"country":{"code":"USA"}},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"naics_codes":["115310"],"award":{"date":"2025-08-07","amount":"3933539.00","number":"12363N25C4004","awardee":{"raw":"BOULDER RIDGE, LLC Bend OR 97702 USA","name":"BOULDER RIDGE, LLC Bend","location":{"zip":"97702","state":{"code":"OR"},"country":{"code":"USA"}}}},"attachments":[],"awards":[{"award_key":"CONT_AWD_12363N25C4004_12C2_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_12363N25C4004_12C2_-NONE-_-NONE-/","piid":"12363N25C4004","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"N8Y8DDDK4EV5","recipient_name":"BOULDER RIDGE, LLC","recipient_uei":"N8Y8DDDK4EV5","recipient_cage":"7BE52","recipient_city":"BEND","recipient_state":"OR","sub_name":"Forest Service","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","office_key":"o-12363N","first_action_date":"2025-08-07","last_action_date":"2026-05-20","actions":4,"obligated":"4759868.08","current_total_value":"4759868.08","potential_total_value":"6155578.21","naics":"115310","psc":"F099","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":3,"description":"HUT DXP NPL STEWARDSHIP IRSC PERFORMANCE PERIOD FOR AWARDED ITEMS: DATE OF AWARD - 11/30/2032 COR: LINDSEY DALTON - LINDSEY.DALTON@USDA.GOV DESCRIPTION OF WORK- PROJECT OBJECTIVES ARE TO RESTORE FORESTED AREAS TOWARDS HISTORIC CONDITIONS, IMPR","method":"piid","confidence":"high","evidence":["award number 12363N25C4004 equals the contract number","same awarding office 12363N"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"12363N26Q4237","latest_notice_id":"92fe15b0c08d4d36b269a45fec2e3783","title":"National Forests and Grasslands of Texas Davy Crockett RD Timber Mark and Cruise","solicitation_number":"12363N26Q4237","notice_type":"k","first_type":"k","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-09-24T16:00:00Z","due_date":"2026-09-24","closes_at":"2026-09-24T16:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"115310","psc":"F099","set_aside":"SBA","state":"TX","county":"48225","county_name":"Houston County","city":"4838884","city_name":"Kennard","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"12363N26R4014","latest_notice_id":"94334ce0a71e4d66bb8712f6ac26bab2","title":"Bitterroot Front 10 Year G-Z IRSC","solicitation_number":"12363N26R4014","notice_type":"k","first_type":"k","first_posted":"2026-08-27","last_posted":"2026-09-17","notices":4,"due_at":"2026-10-08T06:00:00Z","due_date":"2026-10-08","closes_at":"2026-10-08T06:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"113310","psc":"F099","set_aside":null,"state":"MT","county":"30081","county_name":"Ravalli County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-18T04:00:44.545196Z"},{"key":"12363N26Q4248","latest_notice_id":"7252e33b570347bfb7530860cb1fc5de","title":"Leverich Helio Stewardship IRSC","solicitation_number":"12363N26Q4248","notice_type":"r","first_type":"r","first_posted":"2026-09-11","last_posted":"2026-09-11","notices":1,"due_at":"2026-10-15T10:00:00Z","due_date":"2026-10-15","closes_at":"2026-10-15T10:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"113310","psc":"F014","set_aside":"SBA","state":"MT","county":"30031","county_name":"Gallatin County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"12363N26R4015","latest_notice_id":"28ba123a7ac540179a19b1722fef7b24","title":"Forest Products Interests and Contract Preferences","solicitation_number":"12363N26R4015","notice_type":"r","first_type":"r","first_posted":"2026-09-09","last_posted":"2026-09-09","notices":1,"due_at":"2026-12-02T00:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-02T00:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"113310","psc":null,"set_aside":null,"state":"CO","county":"08069","county_name":"Larimer County","city":"0827425","city_name":"Fort Collins","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"12363N23Q4024","latest_notice_id":"c4902fafde874f2c8365270cbd5438bd","title":"Pacific Northwest (PNW) Stewardship BPA- Region 6 (OR & WA) - OPEN/CONTINUOUS","solicitation_number":"12363N23Q4024","notice_type":"o","first_type":"o","first_posted":"2025-03-05","last_posted":"2025-04-15","notices":4,"due_at":"2028-02-01T00:00:00Z","due_date":"2028-01-31","closes_at":"2028-02-01T00:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"115310","psc":"F099","set_aside":null,"state":"OR","county":"41051","county_name":"Multnomah County","city":"4159000","city_name":"Portland","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}