{"canonical":"https://abierto.us/opportunities/12363n25q4227","key":"12363N25Q4227","url":"https://abierto.us/opportunities/12363n25q4227","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","open":false,"response_deadline":"2025-09-17T16:00:00Z","first_posted":"2025-09-03","last_posted":"2025-09-15","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"237310","psc":"Z2LB","set_aside":"SBA","place_state":"MO","place_county":"29161","place_county_name":"Phelps County","place_city":"2962912","place_city_name":"Rolla","winner":null,"award_amount":null,"publications":[{"notice_id":"1861aba04ae346dc83997b7c831c74c3","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","base_type":"k","posted":"2025-09-03","posted_at":null,"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","cancelled":null,"archived":null,"archive_date":"2025-10-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1861aba04ae346dc83997b7c831c74c3/view","enriched":false,"history":[]},{"notice_id":"9a42d4a0d00e439b89b1a970c011f6c7","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","base_type":"k","posted":"2025-09-03","posted_at":null,"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","cancelled":null,"archived":null,"archive_date":"2025-10-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9a42d4a0d00e439b89b1a970c011f6c7/view","enriched":false,"history":[]},{"notice_id":"cb00fc94db6b4c0cb096f496d9a8afd4","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","base_type":"k","posted":"2025-09-03","posted_at":null,"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","cancelled":null,"archived":null,"archive_date":"2025-10-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/cb00fc94db6b4c0cb096f496d9a8afd4/view","enriched":false,"history":[]},{"notice_id":"fcac0b2296d249b19e9783444a127b05","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","base_type":"k","posted":"2025-09-04","posted_at":null,"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","cancelled":null,"archived":null,"archive_date":"2025-10-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fcac0b2296d249b19e9783444a127b05/view","enriched":false,"history":[]},{"notice_id":"6013531549a84538bfc1cce85f27823b","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","base_type":"k","posted":"2025-09-09","posted_at":null,"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","cancelled":null,"archived":null,"archive_date":"2025-10-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6013531549a84538bfc1cce85f27823b/view","enriched":false,"history":[]},{"notice_id":"af5305f4732e423cade761a1a5798660","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","base_type":"k","posted":"2025-09-09","posted_at":null,"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","cancelled":null,"archived":null,"archive_date":"2025-10-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/af5305f4732e423cade761a1a5798660/view","enriched":false,"history":[]},{"notice_id":"3590c7ec4d7c45b38997974bf4687fa1","title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","solicitation_number":"12363N25Q4227","notice_type":"k","base_type":"k","posted":"2025-09-15","posted_at":null,"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","cancelled":null,"archived":null,"archive_date":"2025-10-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3590c7ec4d7c45b38997974bf4687fa1/view","enriched":false,"history":[]}],"latest_notice_id":"3590c7ec4d7c45b38997974bf4687fa1","first_type":"k","notices":[{"dates":{"posted":"2025-09-03","response_deadline":{"raw":"2025-09-17T11:00:00-05:00","utc":"2025-09-17T16:00:00Z","date":"2025-09-17","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1861aba04ae346dc83997b7c831c74c3/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-02","archive_type":"auto15"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"1861aba04ae346dc83997b7c831c74c3","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"1f5eb24401965e24d502a8c05974333ad3b356ce316315d64dd7f98326f2b0f1","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12363N25Q4227","place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-09-03","response_deadline":{"raw":"2025-09-17T11:00:00-05:00","utc":"2025-09-17T16:00:00Z","date":"2025-09-17","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9a42d4a0d00e439b89b1a970c011f6c7/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-02","archive_type":"auto15"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"9a42d4a0d00e439b89b1a970c011f6c7","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4bbadbdff73f49d458713571a314439a34be7889150be334028ae54f7e6e6938","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12363N25Q4227","place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-09-03","response_deadline":{"raw":"2025-09-17T11:00:00-05:00","utc":"2025-09-17T16:00:00Z","date":"2025-09-17","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/cb00fc94db6b4c0cb096f496d9a8afd4/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-02","archive_type":"auto15"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"cb00fc94db6b4c0cb096f496d9a8afd4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"cd734ff475b06e6114a12355b3a86bfae30778074a48d9babe8dd6b09ab452c5","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12363N25Q4227","place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-09-04","response_deadline":{"raw":"2025-09-17T11:00:00-05:00","utc":"2025-09-17T16:00:00Z","date":"2025-09-17","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fcac0b2296d249b19e9783444a127b05/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-02","archive_type":"auto15"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"fcac0b2296d249b19e9783444a127b05","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"869518cde0bed8eaa4f356ca501e0517763c200748387efc428697c0cda657cc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12363N25Q4227","place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-09-09","response_deadline":{"raw":"2025-09-17T11:00:00-05:00","utc":"2025-09-17T16:00:00Z","date":"2025-09-17","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6013531549a84538bfc1cce85f27823b/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-02","archive_type":"auto15"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"6013531549a84538bfc1cce85f27823b","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"52a4e9e1c5ddd6426c8ec00027e3afd7e93ae48dac05fe148ad1daa3bdc38b27","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12363N25Q4227","place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-09-09","response_deadline":{"raw":"2025-09-17T11:00:00-05:00","utc":"2025-09-17T16:00:00Z","date":"2025-09-17","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/af5305f4732e423cade761a1a5798660/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-02","archive_type":"auto15"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"af5305f4732e423cade761a1a5798660","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"47565a7dea33b512fe60fad8cc3f90b5929424de8678af0762d10afc8930140d","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12363N25Q4227","place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-09-15","response_deadline":{"raw":"2025-09-17T11:00:00-05:00","utc":"2025-09-17T16:00:00Z","date":"2025-09-17","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3590c7ec4d7c45b38997974bf4687fa1/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Beaver Lake Dam Rehabilitation at Mark Twain National Forest","agency":{"office":{"code":"12363N","name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-02","archive_type":"auto15"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"3590c7ec4d7c45b38997974bf4687fa1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"285ca77b93d2ddeba7fabc7fb6df63c10103a00f04ffcea56febed598194bb21","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12363N25Q4227","place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"product_service_code":"Z2LB"}],"due_at":"2025-09-17T16:00:00Z","due_date":"2025-09-17","closes_at":"2025-09-17T16:00:00Z","awardable":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","state":"MO","county":"29161","county_name":"Phelps County","city":"2962912","city_name":"Rolla","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"3590c7ec4d7c45b38997974bf4687fa1","description":{"text":"The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.","html":null,"origin":"extract"},"contacts":[{"name":"Thomas Tran","role":"primary","email":"thomas.tran2@usda.gov"}],"place_of_performance":{"zip":"65401","city":{"name":"Rolla"},"state":{"code":"MO"},"country":{"code":"USA"}},"office_address":{"zip":"202501138","city":"Washington","state":"DC","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[],"related":[{"key":"12363N26Q4237","latest_notice_id":"92fe15b0c08d4d36b269a45fec2e3783","title":"National Forests and Grasslands of Texas Davy Crockett RD Timber Mark and Cruise","solicitation_number":"12363N26Q4237","notice_type":"k","first_type":"k","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-09-24T16:00:00Z","due_date":"2026-09-24","closes_at":"2026-09-24T16:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"115310","psc":"F099","set_aside":"SBA","state":"TX","county":"48225","county_name":"Houston County","city":"4838884","city_name":"Kennard","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"12363N26R4014","latest_notice_id":"94334ce0a71e4d66bb8712f6ac26bab2","title":"Bitterroot Front 10 Year G-Z IRSC","solicitation_number":"12363N26R4014","notice_type":"k","first_type":"k","first_posted":"2026-08-27","last_posted":"2026-09-17","notices":4,"due_at":"2026-10-08T06:00:00Z","due_date":"2026-10-08","closes_at":"2026-10-08T06:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"113310","psc":"F099","set_aside":null,"state":"MT","county":"30081","county_name":"Ravalli County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-18T04:00:44.545196Z"},{"key":"12363N26Q4248","latest_notice_id":"7252e33b570347bfb7530860cb1fc5de","title":"Leverich Helio Stewardship IRSC","solicitation_number":"12363N26Q4248","notice_type":"r","first_type":"r","first_posted":"2026-09-11","last_posted":"2026-09-11","notices":1,"due_at":"2026-10-15T10:00:00Z","due_date":"2026-10-15","closes_at":"2026-10-15T10:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"113310","psc":"F014","set_aside":"SBA","state":"MT","county":"30031","county_name":"Gallatin County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"12363N26R4015","latest_notice_id":"28ba123a7ac540179a19b1722fef7b24","title":"Forest Products Interests and Contract Preferences","solicitation_number":"12363N26R4015","notice_type":"r","first_type":"r","first_posted":"2026-09-09","last_posted":"2026-09-09","notices":1,"due_at":"2026-12-02T00:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-02T00:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"113310","psc":null,"set_aside":null,"state":"CO","county":"08069","county_name":"Larimer County","city":"0827425","city_name":"Fort Collins","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"12363N23Q4024","latest_notice_id":"c4902fafde874f2c8365270cbd5438bd","title":"Pacific Northwest (PNW) Stewardship BPA- Region 6 (OR & WA) - OPEN/CONTINUOUS","solicitation_number":"12363N23Q4024","notice_type":"o","first_type":"o","first_posted":"2025-03-05","last_posted":"2025-04-15","notices":4,"due_at":"2028-02-01T00:00:00Z","due_date":"2028-01-31","closes_at":"2028-02-01T00:00:00Z","awardable":true,"open":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-12363N","office_name":"USDA-FS, STEWARDSHIP CONTRACTING BRANCH","naics":"115310","psc":"F099","set_aside":null,"state":"OR","county":"41051","county_name":"Multnomah County","city":"4159000","city_name":"Portland","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}