# Boundary Dagger Road Project in the Salmon-Challis NF

Canonical: https://abierto.us/opportunities/1202l3

- Solicitation number: 1202L3
- Notice type: Presolicitation
- Status: Closed. Deadline was May 1, 2024 at 2:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Salmon and Challis National Forests (1202L3)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Z1LB Maintenance Of Highways/Roads/Streets/Bridges/Railways
- Set-aside: Total small business set-aside
- Place of performance: Shoup, Idaho
- County: Lemhi County (FIPS 16059). https://abierto.us/counties/lemhi-county-id-16059
- First posted: April 16, 2024
- Last posted: April 16, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/9b1cd2d2c27145b0a5a0e279dda753f5/view

## Description

The project consists of preparing pits, mining materials, crushing pit material into blended aggregate with commercial source additives meeting contract requirements and performing the following:

SLBD 2 items (Roads 579 and 568):

**Base Bid:** 6 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4” on roads 579 (NFSR 40579 Stanley-Landmark or “Bear Valley Rd”) and 568 (NFSR 40568 or Boundary-Dagger Rd). Also includes 10.50 miles of roadbed reconditioning.

**Option Items:** **Up to 4.5 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4” on road 579. Select cleaning of culverts and bridge decks. Seafoam Road items (Road 008) - (starting after completion of 579 and 568 items):

**Base Bid:** 3.9 miles of crushed and placed Aggregate Surface Course, to a compacted depth of 4” on road 008 (NFSR 40008 Beaver Creek Rd or “Seafoam Rd”). Also includes 7.10 miles of roadbed reconditioning.

**Option Item:** **Up to 3.2 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4” on road 008. NOTE: Aggregate items shall utilize Blind Summit Pit or another approved source by the CO, including commercial source(s). ** “Up to” items are subject to availability of funds and not to exceed the quantity listed in the SCHEDULE OF ITEMS.

Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing.

This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding.

Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs).

Surface to the compacted depth specified in the attached road logs the full roadway width, including all existing turnouts and widenings. Intersecting roads shall be bladed, shaped and surfaced for a smooth transition. Spread control and staking for aggregate is the responsibility of the contractor. Protect the environment and resources impacted by all construction activity according to

## Publications

- April 16, 2024: Presolicitation, due May 1, 2024 at 2:00 PM EDT. Notice 9b1cd2d2c27145b0a5a0e279dda753f5. https://sam.gov/workspace/contract/opp/9b1cd2d2c27145b0a5a0e279dda753f5/view

## Points of contact

- Erick Plamann, erick.plamann@usda.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/1202l3.